Dubai International Airport (DXB) Airport Runway Closure

Apr 15, 2019

Dubai’s southern runway (RWY 12R/30L) will be closed from Apr 16 to May 30 for Runway Rehabilitation.

This project will strengthen and resurface the runway and the adjacent taxiway involving the placement of approximately 60,000 tonnes of asphalt and 8,000m3 of concrete. At the same time, over 5,500 runway lights and 800 km of primary cables will be replaced. This work can only be completed with a closure of the runway for a period of 45 days, meaning that capacity will be severely reduced.

With only one runway in use (RWY 12L/30R), operating at 96% capacity at one of the world’s busiest airport, Slots will be very hard to obtain as Dubai Airports prioritize commercial airlines which are already affected by this massive project.

Dubai International Airport DXB

Most flights will be diverted to Dubai World Central (DWC) during the 45-day upgrade of southern runway.

The diversion from 16 April to 30 May means flight traffic is expected to surge as much as 700% at the DWC according to authorities, running into the same Slot issue as DXB.

We recommend to apply for the Slots as soon as you can in order to avoid any unwanted situations that you might not be able to operate on DXB or DWC.

Written by – Kevin Singh

Check Out Our Latest Releases…

Flying Pets into the UK on Private Jets: Trip Support Guide

Flying Pets into the UK on Private Jets: Trip Support Guide

The UK government has specific procedures for transporting pets such as dogs, cats, and ferrets into the UK with a private jet. The Department for Environment, Food and Rural Affairs (Defra) must license the flight operator’s fleet to carry pets into the UK, and the...

read more